Product under development

MDM

Mobile Drink Maker
Created by Hans J. Jakobsen

Client story

The invention existed. The route to market still had to be built.

Hans J. Jakobsen created a portable hot-drink concept built around a drinking device and compatible beverage portions. The concept was supported by registered patent protection, but a patent alone does not create a manufacturable product, a fundable company or a campaign that can make responsible promises to backers.

Early-stage hardware Patented concept Investor readiness Kickstarter pending approval
01

From here

MDM had an inventor, a practical problem to solve, product design work and patent protection. What remained unclear was how the product, consumables, manufacturing path, funding need and market story would operate as one business.

02

To there

The project now has a more structured commercial and financial foundation, investor-facing material, technical decision support and a Kickstarter campaign designed as controlled market validation rather than a claim that mass production is already solved.

Hardware makes every promise expensive

A product that heats water, handles food-contact materials and uses compatible beverage portions must connect design, power, safety, certification, suppliers, tooling, fulfilment and customer support. A weakness in one part can stop the entire launch.

The work therefore had to do more than make MDM sound attractive. It had to distinguish what was proven, what remained under development and what must be completed before production and delivery commitments can be made.

What Skale Egenkapital helped build

01

Product and business definition

Clarified the user problem, use cases, device-and-consumables logic and the difference between an invention and a repeatable commercial offer.

02

Financial structure

Built models to test costs, pricing, sales assumptions, cash requirements and the relationship between product sales and recurring beverage-portion revenue.

03

Investor readiness

Structured investor material and strengthened its treatment of risks, assumptions, governance, intellectual property, funding use and the limits of early-stage forecasts.

04

Kickstarter preparation

Developed the campaign story, reward logic, readiness questions, risk disclosures and a more defensible path from demand validation towards pre-production.

05

Technical-commercial assessment

Examined key technical choices where power, heating time, safety, cost and the customer promise directly affect one another.

06

Launch discipline

Created a clearer separation between concept images, prototype evidence, engineering work, production readiness and information that can safely be published.

The campaign became more credible by promising less

The strongest campaign is not the one that hides uncertainty. It is the one that explains what works today, what still needs to be solved and what support can realistically make possible.

What changed

The product story became clearer and more commercially grounded

Investor and financial assumptions gained a structured basis

Technical and industrial risks became visible before launch

Kickstarter became a validation route rather than an unsupported promise

The campaign is prepared, but it is not public yet

MDM currently has no public company website and no public campaign link. The Kickstarter campaign is moving through the path towards release and will become public only if it receives platform approval and the remaining launch-readiness conditions are satisfied.

MDM must not be presented as a finished product already available for mass delivery. Final engineering, certification, supplier, manufacturing and fulfilment work remains part of the development path.

From invention to a defensible launch

Does your product story move faster than your production readiness?

Discuss your situation  →